Showing posts with label renovation. Show all posts
Showing posts with label renovation. Show all posts

Monday, March 30, 2009

MAME cabinet non-update

A brief update on the MAME cabinet is probably in order after all these years.

Short story--it remains stalled pending basement development. I put it on hold a number of years ago until I had more of the basement finished.

Actually, we now have our combined media room + playroom area finished in the basement, and after I install the baseboard trim in there, finishing up the MAME cabinet is probably next on the agenda.

It's a good time to tackle that--with the new TV downstairs, that frees up the 27" Toshiba that I bought for the cabinet to actually be used for the cabinet.

All that's really left is installing the TV, the fans, painting it, and then installing the marquee and display plastic (already cut and fitted). Oh, I also still have the coin door to slap in there. So there's not really a lot of work to do, and now that I have the media room done, there's a corner to stick the cabinet in all ready and waiting.

Pictures will, of course, follow once this stage is reached.

Tuesday, October 28, 2008

Megaupdate (the kitchen sink post)

So what exactly has been going on around here and what's with the general abandoning of the blog?

Well, as I'm largely writing this for my own diversionary amusement, it's fallen by the wayside in the wake of more important things. I still want to write here, I'm just having problems finding the time--it also turns out that small children are capable of consuming limitless amounts of spare time, though admittedly delivering the goods in the emotional rewards department.

The MAME cabinet work stalled out a while ago--the intent is still to finish it. I've got the back door installed and on, the TV shelf is there, holes are cut for fans, coin door, etc. The light fixture is installed and working, though the lamp is back out pending final assembly.

I also cut the plastic for the front and for the marquee area. For mounting the marquee, I've got the marquee retainer as mentioned previously. For the front glass, I bought some quarter round moulding with 90-degree edges and installed it with one flat edge attached to the cabinet, and the other flat edge facing the front of the cabinet to make a perfect resting place for the glass. I'll probably caulk the left and right edges to reduce noise and vibration and then maybe use some more marquee retainer at the top and bottom.

There are a few reasons for the stall-out though--the next step is going to be lifting the TV up there and adding supports in the appropriate places. However, while I have a spare, heavy 27" Sony television that I could use there, it's not the ultimate TV I want in the cabinet. That would be the (much lighter) 27" Toshiba I purchased a few years ago, currently in use in the living room, the only area of the house suitable for TV watching right now. But now that the finishing of our basement rec room is likely to happen before the cabinet gets finished, I'm holding off fitting the Sony into the cabinet, in anticipation of getting a new TV in the rec room and then upgrading the MAME cabinet to the Toshiba.

So yes, the basement finishing is the other part of this equation. We decided to finish the main rec room area rather than tackling the whole basement at once. That's one giant 16x30 area where the eastern 16x11 will be designated the kids' playroom, the western 16x11 the TV area, with a handy 16x8 DMZ in the middle. I'm debating some sort of invisible barrier that will keep children from wandering over into and otherwise messing with the TV area and the suppositional new TV. I'll post pics as soon as the barrier is installed so you can all look at it and echo R2-D2--oops, I mean Fidgit from Time Bandits by saying, "Oh, so that's what an invisible barrier looks like." Sorry for the mistake. Fidgit is only played by R2-D2. Apparently, it used to take several hours for R2-D2 to get into his Fidgit costume before filming, and of course, all R2's dialogue was redubbed...

The DMZ is also going to be the location of the roleplaying table. Not precisely KoDT though--although the table in question did indeed live a former life as a dinner table, we're playing pulp Rolemaster, so everyone's an investigator, not a knight.

I'm using a mix of homebrew adventures, CoC adventures and even some Shadow World modules for any sequences involving translation to alternate dimensions.

Finally, in order not to give the lie to the title of the post, I'll just have to mention the shortsighted construction of the kitchen sink. Firstly, the left hand sink drain comes down and joins the drain for the right hand side, but it does so at a nearly horizontal level. After several years of washing in the left sink and stacking for drying in the right sink, this horizontal part of the drain was clogged with all manner of really disgusting things. One stomach-churning cleaning later, and we now wash in the right hand sink, with its vertical drain, and dry in the left hand sink. The other daft thing about this sink is that the trap is placed so low that there is zero clearance from the bottom of the trap to the floor of the cupboard, meaning that the U-bend can't even easily be opened let alone easily drained/explored/etc with any kind of bucket underneath it. Frustrating.

Monday, September 12, 2005

MAME cabinet: a one-sided discussion

I was on sod duty Friday evening and Saturday morning, and we now have a grass lawn in the back. Putting down sod is great; you go from boring dirt backyard to grass in a matter of hours. It's far more satisfying than the topsoil, and takes far less time to do. I was very pleased with the results, though it is now stubbornly refusing to rain.

Michelle very kindly took the boys out to the grocery store, and then the toy store on Sunday afternoon, giving me about four hours to myself, with the idea that I'd work on the cabinet. I had a few things I wanted to do on the PC, so I got that out of the way, and then went downstairs. I'd put in about an hour of work, and then the power went off in the house. Argh! If it's not one thing, it's another. I finally had some free and clear time to make as much noise and sawdust as I wanted, and the hydro company shackles me.

The power came back on after a couple of hours, and I managed to finish all the cuts to the first sheet of MDF. I now have one complete side panel, which looks pretty impressive standing against the wall.



I maneuvered the second sheet of MDF onto the table, and I'm ready to mark all the cuts on it, and then get cutting. I think I'll just put the existing side panel on top of this sheet, stencil around it, and and then cut. Once both sheets are cut, I'll clamp them together and sand the edges to ensure they're the exact same size.

I also got around to trying the melamine edging on the control panel. It's a 50' roll of black edging that you iron on. I got that done, and it looks pretty spiffy.





Given the amount of effort T-molding is going to take, and the fact that I've got a non-standard MDF thickness (11/16" versus 3/4", which wasn't available), I think I'll just try this edging on the whole panel. Saves me having to router that channel for the T-molding.

It's great to see this thing start to take shape. It's going to be a blast starting to put the thing together.

Tuesday, August 23, 2005

MAME cabinet: why is the work progressing so slowly...

... I hear you not asking.

What with one thing and another, putting up the fence has taken up a lot more time than I would have liked, mostly because the available time to work on it has been limited.

We had family things to go do the last weekends of July, and the first weekend of August, so that really delayed the fence building.

However, it's finally all finished now, except for putting the post caps on top of the posts to keep water from getting into the grain. I just did the gate on Sunday, so now we can just close the gate and throw the kids out of the back door. Of course, all they have to play with right now are weeds and dirt.

I have also finally started cutting bits out from the first sheet of MDF. Hooray! It cuts nicely and with a finishing blade on the circular saw, the MDF gets a really smooth, clean edge on it.

My second sheet of MDF has a bit of a crack in one corner, so I've been trying to plan out how I can cut around it. I'm already making the doors, front and back, out of left-over 5/8" plywood. It saves me buying a third sheet of MDF, and I prefer the idea of a lighter door hanging on there than I'd get with the MDF.

I was also having doubts about the weight of the TV sitting on a shelf inside the cabinet. I was worried it was going to be too heavy--more a conceptual thing though: the TV just seems so heavy when you're trying to move it. I threw a couple of 2x4 scraps on the floor and slapped a piece of plywood across them and proceeded to stand on it. It supported my weight without flexing at all. So if it can support me, it will definitely support the TV, especially if I add some bracing underneath. Thus, my TV stand in the cabinet is going to be made out of plywood. This means one less piece to cut out of the MDF, so I won't have to use the cracked portion.

So far, I've cut out the kickplates, one of the 3.5" spacers for the front of the cabinet, and the front and back halves of the bottom. I've opted to go with a 5" kickplate at the bottom (versus 3.5" on the reference plans) and reduce the door height on the front and back accordingly. I'll probably recess the floor to 1 or 2" above the bottom, but that depends on what sort of wheels I decide to go with.

I also picked up a Dremel tool from a coworker for relatively cheap, along with a Rotozip spiral saw, so those should come in handy for trimming the small fiddling detail bits on the cabinet outline, and even cutting a groove for the T-molding if I end up going that route.

It's nice to see it starting to progress, even if at a snail's pace. Once winter rolls around, there'll probably be more time to work on it, as I don't be building fences or laying sod down.

I will of course be shoveling gargantuan amounts of snow in inhumane temperatures, but that's only to be expected.

Wednesday, August 03, 2005

Learning to fence...

Constructing the fence has been taking up all my spare time lately.

All the runners were finished by last Thursday (the 28th), and so I was able to start putting up fence boards on Friday night and a lot of the day Saturday. I did a few more on Monday as well, but haven't managed to get out there since then. I'm roughly half-finished with the fence boards, though there are still a few areas with gaps to fill, where a full fence board wouldn't fit at the end of a section.

It's been over 30 degrees here over the last few days, so the fence was pretty hot work, with the sun beating down out of a clear blue sky. My skin has started to lose its geekly white pallor, but I've managed to avoid any burning by dousing myself liberally in sunscreen before venturing outside.

And in other pointless news, I got my second sheet of MDF hauled down the stairs, so cabinet construction should be beginning soon (fingers crossed).

Tuesday, July 26, 2005

A 4x8 sheet of 11/16" MDF...

... is extremely heavy!

I got the MDF delivered along with all the wood for the backyard fence. Those sheets are seriously heavy! The guy who delivered the MDF carried both sheets at once into the garage for me, so I figured I should be able to manage one sheet down the stairs at a time, as I've done with plywood before.

No such luck. This stuff is dense. With Michelle steadying one end, I managed to maneuver one sheet down there, but every time I look at the second sheet in the garage, I lose all desire to try again.

Maybe I should do some cutting of this sheet in the garage.

I'm really eager to get going on the cabinet construction, but it's going to have to wait. I have a pile of wood in the driveway that I want to turn into a fence.

All the posts have been set for the fence, and I got all the fence clips in place. Sunday and Monday evening, I got a few of the runners in place, so one side of the yard is "runnered" at the moment. That represents about 29' of fence, so only another 80' to go, and then I can start in on the fence boards.

Fenced lot, here we come.